Work on The Ritz-Carlton Residences, Palm Beach Gardens site continues at a vigorous pace in preparation for groundbreaking and commencement of vertical construction. Excavation is now taking place and elevations are being created as part of construction of building roads, fire roads and emergency access. Full dust control including a sprinkler system is complete and operational. Preparation for sheet piles and vibroflotation/ compaction of soil is scheduled to take place later this spring along with commencement of construction of the marina docks.