fbpx Skip to main content

Rebar Framework for North & East Tower Foundation Bases Now Complete

March 28, 2024

Over 229 tons  of rebar have been delivered and tied together to form the framework for the foundation pillar mats of the East and North Towers of The Ritz-Carlton Residences, Palm Beach Gardens.

The precise installation of the rebar framework establishes a solid base for the structural integrity and stability of the foundation pillars. Our committed team of skilled workers has diligently ensured that every rebar is accurately placed in accordance with engineering guidelines, maintaining stringent standards of quality and safety. This meticulous approach guarantees that the structure will have the required strength and resilience to endure diverse loads and environmental conditions.

Rebar bundles being delivered to the site by flatbed truck where they were unloaded by canes and placee in designated storage areas before framework installation began.

Workers strategically placing rebar for North Tower pillars before they begin interconnecting and securing the framework adhering to precise engineering specifications.